Main Product Series:
Henan Mine Crane Co.,Ltd started in 2002,and have developed an leading industrial crane manufacturer in China.
There are many types cranes and crane spareparts:
single girder bridge crane
double girder bridge crane
single girder gantry crane
double girder gantry crane
semi gantry crane
mini portable gantry crane
rail mounted gantry crane
container gantry crane
hydraulic lifting platform
column-type/wall-hanging jib crane
various lifting mechanism:wire rope hoist, chain hoist, winch, grab, magnet, hang beam...
Product description:
Special Gantry Crane For Subway Construction Heavy working Duty
Gantry Crane for subway construction is a heavy class lifting equipment that runs on rails. It mainly consists of a steel structure(trussed main beam,Round pipe outriggers,etc.), hoisting trolley mechanism(Equipped with lifting mechanism, trolley running mechanism and hydraulic turnover mechanism), an operating mechanism and electric control part. The hoisting trolley is used as the lifting mechanism runs along the upper flange of the I-beam of the main beam when working.According to the different dumping directions, the outrigger structure can be divided into two types: A type and U type.
The crane traveling mechanism adopts 8-wheel 4-drive mode and is equipped with a windproof rail clamp. When the crane works normally, the clamp of the rail clamp leaves the rail. When the crane stops working, the operator puts down the clamp to clamp the rail to prevent the crane from sliding.The lifting mechanism uses the hanging beam as the lifting tool, and a free rotating hook is set in the middle of the hanging beam for lifting segments and other materials.
The lifting mechanism uses the hanging beam as the lifting tool, and a free rotating hook is set in the middle of the hanging beam for lifting segments and other materials. The trolley is equipped with a hydraulic turnover mechanism, which is composed of a hydraulic workstation and a slag turnover hook. Before the lifting of the slag bucket lifted by the hanging beam, the driver controls the action of the hydraulic overturning mechanism. The hydraulic cylinder pushes the slag tipping hook back to a specific position, and then the slag bucket is lifted above the slag tipping hook. The driver controls the slag tipping hook to move forward to the bottom of the slag bucket, and the slag bucket drops. The eccentric overturning shafts on both sides fall on the slag tipping hook and continue to drop. The slag bucket starts to overturn using its own weight eccentric, and then the dumping is completed.
In order to meet the characteristics of short construction period and frequent replacement of the construction site, our company has purposefully added the span change function on the main beam to facilitate the change of the span after the replacement of the construction site.
At the same time, a steering dumping trolley is developed to adjust the dumping direction according to the position of the slag outlet. With this trolley, the construction company can use a crane to lift and overturn the soil in different slag discharge directions.