Customization: | Available |
---|---|
Certification: | CE, ISO9001: 2000, GOST |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Brief Introduction
Type: QD type double beam overhead crane
Lifting capacity: up to 350/75 ton
Span: 10.5~31.5m. Non-standard design can also be manufactured according to your require.
Structure:
1. The bridge: traverses on the runway;
2. The trolley: traverses on the bridge and lift up and down;
3. The runway: tied to the building structure.
ifting Capacity T | 5 | 10 | 16/3.2 | 20/5.0 | 25/5.0 | 32/5.0 | 50/10.0 | |||
Span M | 10.5-31.5 | |||||||||
Lifting height(M) | Main Hook | 16 | 16 | 16 | 12 | 12/11.0 | 16 | 12 | ||
Aux Hook | 18 | 11 | 14/13 | 18 | 16 | |||||
Speed(M/min) | hoist | Main hook | A5 | 12.5 | 8.5 | 7.9 | 7.2 | 7.3 | 7.8 | 5.9 |
A6 | 15.5 | 13.3 | 13 | 9.7 | 9.8 | 9.5 | 7.8 | |||
Aux hook | 14.5 | 12.7 | 12.7 | 19.5 | 13.2 | |||||
Trolley traveling | 37.2 | 43.8 | 44.6 | 44.6 | 37 | 42.4 | 38.5 | |||
Bridge traveling | A5 | 89.8 /92.3 | 89.8-91.9 | 84.7-87.6 | 84.7/ 87.6 | 85.5/88 | 74.2-87.6 | 74.6 | ||
A6 | 116.2/ 117.4 | 112.5-116.8 | 112.5 | 112.5/ 101.4 | 112/ 101.4 | 86.8-101.4 | 87.3 | |||
Weight(Kg) | Trolley | A5 | 2126 | 3424 | 6227 | 6856 | 7185 | 10877 | 15425 | |
A6 | 2224 | 3562 | 6427 | 7180 | 7856 | 11652 | 15765 | |||
Total Weight | A5 | 12715-31405 | 14270-34405 | 19128-39428 | 19947-41497 | 20795-42796 | 26901-52748 | 35317-64880 | ||
A6 | 12991-31596 | 14719-34699 | 20045-41315 | 20984-44225 | 22632-16324 | 28061-55272 | 36075-67242 | |||
Max Wheel Load KN | A5 | 74-125 | 102-160 | 141-205 | 163-231 | 185-255 | 237-327 | 333-450 | ||
A6 | 75-126 | 104-162 | 145-211 | 167-239 | 189-263 | 242-335 | 336-457 | |||
Rail recommended | Trolley | 15kg/m | 43kg/m | |||||||
Bridge | 43kg/m | QU70 | QU80 | |||||||
Power Source | 380V 50HZ 3Phase or based on your request |
1. Hoist and electric parts will be packed by plywood crate, for avoiding the demage from goods crash and impact during the delivery.
2. Girders and other main parts will be packed by plastic woven cloth, for preventing rust from soppy condition during the transportation.
3. Only the best transport solution will be taken for saving your cost uttermost on finance, security and time.