Heavy Weight Shipbuilding or Container Loading Gantry Crane
ME shipbuilding gantry crane, a type of gantry crane of heavy lifting load, large span and high lifting altitude, is special for fragmented transport,end-to-end joint and turning operation of large ship hulls.
Ship gantry crane task is to put all the parts required for the manufacture of the ship (ribs, steel, steel, etc.) from the ground transportation to manufacturing place. this transport work must be able to complete the task in a very long journey in transportation quickly. therefore, the number of cranes decided, enough to reach the dock area of the entire foundation, and each crane mutually interfere with each other in principle.
1. It have multipe functions of single hanging, hoisting, turnover in the air, slight horizontal turnover in the air and so on;
2. The gantry falls into two categories:single girder and double girder. To rationally utilize materials, the girder adopts optimum design of variable section;
3. The upper crab has two main hooks, which are sparately fixed at the outside of the girder.
4. The lower crab has a main hook and a secondary hook, which are fixed at the center of the two girders;
5. Both the upper crab and the lower crab can cross each other for operation.
6. All operating mechanisms employ frequency control;
7. On the top of the girder at the side of rigid leg is equipped a jib crane to accomplish maintenace of upper and lower crabs.
8. To prevent storm attack, such safe and reliable anti-wind devices as rail clamp and ground anchor are furnished.
Main Technical Characteristics
1.Multiple protections, ensuring safety:
The crane is equipped with a whole crane equipment safety monitoring system, adopts PLC+Frequency Converter Communication Control Synchronous Control of multiple lifting points for automatic adjustment of balance, which makes the lifting more stable, safe and reliable operation;
2.Intelligent Positioning,reaching more precise positioning:
(1)Intelligent Automatic Positioning Function makes the positioning more precise.
(2)Double rails in one side design reduces the crane wheel pressure with effect, which saves the construction cost.
3.Energy Saving&More Stable lifting;
(1)The production of whole crane uses high strength special steel materials,which ensures not only the safety of structure,but continuous lifting work with the same loading conditions.
(2)The 750t gantry crane adopts to the power supply of 10KV, electric energy can be recycling automatically when heavy goods unloading process, it saves energy of 25%~30%.
ME Shipbuilding Gantry Crane |
Lifting capacity(ton) |
2*50+100 |
2*75+100 |
2*100+160 |
2*150+200 |
2*400+400 |
Two trolleys lifting |
150 |
200 |
300 |
500 |
1000 |
Section reverse lifting |
100 |
150 |
200 |
300 |
800 |
Working duty |
A5-A7 |
Span |
50 |
70 |
38.5 |
17.5 |
18.5 |
Lifting height(m) |
H1 |
35 |
50 |
28 |
65/10 |
76/13 |
H2 |
35 |
50 |
28 |
65/10 |
76/13 |
Lifting speed(m/min) |
Full load |
0.5~5 |
0.5~5 |
0.4~4 |
0.5~5 |
0.32~3.2 |
Non-load |
1~10 |
1~10 |
0.8~8 |
1~10 |
0.64~6.4 |
Crane travelling(m/min) |
Full load |
2.5~25 |
2~20 |
3~30 |
1~25 |
3~30 |
Non-load |
3.5~35 |
3~30 |
4.5~45 |
1~30 |
3~40 |
Trolley travelling(m/min) |
Full load |
2.5~25 |
2.5~25 |
3~30 |
1~25 |
3~30 |
Non-load |
2.5~35 |
2.5~35 |
3~45 |
1~30 |
3~40 |
Wheel load |
KN |
260 |
320 |
330 |
700 |
750 |
Total power |
KW |
400 |
530 |
650 |
1550 |
1500 |
Power source |
3-phase AC 50Hz 10KV |
Q1: What's the information should I provide when inquiry?
A1: The more details or drawings,the better.Such as Lifting capacity, Lifting height,Span,Voltage or others special requirements.
Q2: Can you provide custom service?
A2: Yes, of course. We are manufacturer and we have our own engineer group.They can out customized design according to your requirement. You just need to tell us your requirements.
Q3: Are there professional technicians to assist in the installation?
A3: Yes. We have a professional installation team and have been to many countries to assist in installation. lf you need us to provide this service,please let us know in advance and we will provide you with the best solution.
Q4: How do you guarantee the quality?
A4: We will constantly check the quality during the manufacturing process, and strictly test the equipment before shipment, and we will also send you a quality certificate.
Q5: What international certifications have your crane passed?
A5: Our crane has passed CE,ISO,GOST.SGS,TUV.BV.and so on.
I want to inquire about other questions>>