Lifting Beam Bridge Erection Crane

Product Details
Customization: Available
After-sales Service: Site Guidance
Warranty: 18months
Manufacturer/Factory
Gold Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Year of Establishment
2002-09-30
Management System Certification
ISO9001:2008, ISO14001:2004, OHSAS18001:2007
  • Lifting Beam Bridge Erection Crane
  • Lifting Beam Bridge Erection Crane
  • Lifting Beam Bridge Erection Crane
  • Lifting Beam Bridge Erection Crane
  • Lifting Beam Bridge Erection Crane
  • Lifting Beam Bridge Erection Crane
Find Similar Products

Basic Info.

Model NO.
construction crane
Certification
CE, ISO9001
Condition
New
Maximum Lifting Weight
>200t
Maximum Lifting Height
Lifting Beam Gantry Crane
Operation Form
Cabin
Type
Bridge Construction Crane
Main Girder Form
Special
Product Type
Special Bridge Construction Crane
Lifting Capacity
450*2t
Power Supply
380V50Hz3-pH,AC
Control Method
Cabin
Transport Package
Bulk Carrier Transportation
Specification
CUSTOMIZED
Trademark
KUANGYUAN
Origin
Henan, China
HS Code
8504403090
Production Capacity
1000 Sets/Year

Product Description

Main product Series:
 
Lifting Beam Bridge Erection Crane
Established in China in 2002, Henan Mine Group is a multi-national specialist designer, manufacturer & supplier of:
* Overhead Bridge Cranes
* Gantry Crane
* Ladle Foundry Crane
* Rail Mounted Gantry Crane (RMG)
* Slewing jib cranes
* Electric wire rope hoists

* Electric winch
* Euro hoist
* Lifting platform
* Crane component sets
* Material handling equipment

Product description:
450T Lifting Beam Bridge erection crane provided by Henan Mine Crane for bridge construction
 
Lifting beam gantry cranes can be used to lift two-piece prefabricated beams at the same time, and a single gantry crane equipped with double hoisting equipment to lift prefabricated beams separately. The lifting capacity of two lifting machines at the same time is generally 450 tons, and the lifting capacity of a single lifting machine. The weight is usually up to 900 tons.
 
Lifting equipment, which can achieve all-round mechanized action. It is mainly used to lift the prefabricated beam from the beam-making platform to the beam storage platform.
After the prefabricated beam is completed, it is lifted from the beam-holding platform to the beam-carrying vehicle. As a lifting device, complete the assembly and disassembly of the bridge machine. It is also used to erect bridges with low.
 
The arm is the main load bearing beam of the bridge frame and is a double box girder structure. According to the force conditions of the arm and finite element analysis, each box girder is designed as a box-shaped variable section.
 
Classification:
A bridge erector is very different from a crane in the normal sense of the word. Its requirements are demanding and there are girders walking on pieces, or called longitudinal movement. The bridge erector is divided into
1. highway bridge erector,
2. railway bridge erector,
3. public-railway bridge erector,
4. high-speed railway bridge erector,
5. section assembly bridge erector,
6. mobile moulding bridge erector.
The road and railway bridge erectors are generally single girder structures; the bridge builders are different from the bridge erectors in that the erectors are prefabricated girders placed on the piers, while the bridge builders have mould that can be poured directly on site.

Features:
As with other cranes used in general industrial buildings, there is adequate safety equipment, such as
1. Quality problems of products sold by our company will be solved as per the "three guarantees" system of our company by the "three guarantees" service team;
2. Related personnel will be sent to the site immediately after receiving quality complaints (by call, letter or oral notice) from clients;
3. Personnel involved in after-sales service shall be serious and considerate in handling the problem to make clients care-free;
4. In addition to solve quality problems, personnel involved in after-sales service shall train clients, answer their technical inquiries and related questions free of charge;
5. Related cost for products with quality problem will be shouldered by our company. Our company charges for quality problems caused by clients (or problems after the warranty term), but the charge will not be higher than the expense (or cost).
 
However, as the bridge erector is a large-scale special equipment for bridge installation, the safety factor at the construction site is required to be high. In addition to having professional personnel on site to direct the bridge erector, the speed requirement of the bridge erector is generally low and runs relatively slowly, which also ensures safety.

Why us:
Painting of Cranes  >>primer and finishing paint;Anti-corrosion coating
>>Color: yellow, red, blue according to your demand. 
>>Average thickness: about 100 microns
Safety Guarantee Weight overload protection device, Top quality long time bearing polyurethane materials buffer, crane traveling limit switch, voltage lower protection function, emergency stop system, current overload protection system and so on!
Pre-sale suggestion >>Efficient response rate during office hours.
>>Professional and comprehensive crane design consultation.
>>Sincere and friendly service attitude.
Service(Quality after-sales & Online guidance) 1. Quality problems of products sold by our company will be solved as per the "three guarantees" system of our company by the "three guarantees" service team;
2. Related personnel will be sent to the site immediately after receiving quality complaints (by call, letter or oral notice) from clients;
3. Personnel involved in after-sales service shall be serious and considerate in handling the problem to make clients care-free;
4. In addition to solve quality problems, personnel involved in after-sales service shall train clients, answer their technical inquiries and related questions free of charge;
5. Related cost for products with quality problem will be shouldered by our company. Our company charges for quality problems caused by clients (or problems after the warranty term), but the charge will not be higher than the expense (or cost).
Design and Construction  Rules  1.Design rules for cranes GB/T3811-2008;
2.Safety rules for lifting appliances GB6067.1-2010;
3.General Gantry Crane GB/T14406-2011;
4.Gantry crane manufacturing and tolerances of rail installation GB/T10183-2005;
5.Crane test specification and procedures GB/T5905-1986;
6.Crane electric control equipment JB/T4315-1997;
7.Important application wire rope GB8918-2006;
8.Carbon structure steel GB/T700-2006;
9.Low alloy high strength structure steel GB/T1591-2008;
10.Welding joint radiographic inspection standard JB928-1994;
11.Steel welding joint manual ultrasonic flaw detection way GB11345-1989.

Photos for reference:
 
Lifting Beam Bridge Erection Crane
Lifting Beam Bridge Erection Crane
Lifting Beam Bridge Erection Crane
Company Profile:

Lifting Beam Bridge Erection CraneLifting Beam Bridge Erection CraneLifting Beam Bridge Erection CraneLifting Beam Bridge Erection Crane
Lifting Beam Bridge Erection Crane
Lifting Beam Bridge Erection Crane
Lifting Beam Bridge Erection Crane

FAQ & Contact us:
 
Customized as the following technical parameters for your checking 
lifting capacity   ?  tons
lifting height   ?  meters(it is the distance from center of hook to floor)
lifting speed single or double or VVVF?
span   ?  meters(it is center to center distance between railways)
power supply 380V50Hz3-Ph,AC?
control method pendant line control or wireless remote control or cabin control?
Do you also need us to supply rail and bus bar: YES or NO?
If yes, could you tell me the crane traveling length is 
  ?   meters;
What metarials to lift?
Usage: general industry ? Indoor or Outdoor ?
Lifting Beam Bridge Erection Crane



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier